Extradosed bridge in Kurow over Dunajec - SOFiSTiK Grasshopper Tekla

Published

Category

Topics

Share Post

Share on linkedin
Share on facebook
Share on twitter
Share on email

Extradosed bridge in Kurow over Dunajec – SOFiSTiK Grasshopper Tekla

In this post, I’d like to point you to a master thesis done by Mateusz Łapiński at the Warsaw University of Technology, Faculty of Civil Engineering.

The master thesis focuses on BIM methodology and its applications in infrastructure projects. On the basis of obtained materials, Mateusz made a parametric 3D model of the structure using additional applications cooperating with Tekla Structures. In parallel, the analytical model is generated in Grasshopper to perform its analysis in SOFiSTiK FEA.

The presented bridge is currently being built in Malopolska Province, Poland. The bridge will be located in Kurow and will be a crossing over the Dunajec River along the DK75 national road connecting Nowy Sacz with Krakow.

And although the model and outcome of the thesis weren’t used for the real project; The workflow used gives a very good understanding of the interoperability of Rhino/Grasshopper – Tekla – SOFiSTiK.

A huge Thank You to Ministry of Bridges and Gabriel Neves for doing this great interview and demonstration with Mateusz.

Watch also the webinar about Parametric Bridge Design with Rhino Grasshopper.

If you haven’t already, be sure to subscribe to my newsletter for the latest news & workflows.

SHARE POST

Share on facebook
Facebook
Share on email
Email
Share on twitter
Twitter
Share on linkedin
LinkedIn

SHARE POST

Share on linkedin
LinkedIn
Share on facebook
Facebook
Share on twitter
Twitter
Share on email
Email

RELATED POSTS

Parametric Design in SOFiSTiK, Grasshopper and Tekla Structure
Wind Loading on a Bridge with SOFiSTiK
How new design methods lead to a different description
Automated Design Work of Precast Concrete Girder Viaducts

SHARE POST

Extradosed bridge in Kurow over Dunajec – SOFiSTiK Grasshopper Tekla

Share on linkedin
Share on facebook
Share on twitter
Share on email

RELATED POSTS

Parametric Design in SOFiSTiK, Grasshopper and Tekla Structure
Wind Loading on a Bridge with SOFiSTiK
How new design methods lead to a different description
Parametric Design in SOFiSTiK, Grasshopper and Tekla Structure
Wind Loading on a Bridge with SOFiSTiK
How new design methods lead to a different description
Automated Design Work of Precast Concrete Girder Viaducts

Text Input in SOFiSTiK
Fundamental Course

Be among the first to get notified as soon the online course is open to enrol.

And while waiting, read the Free Text Interface Introduction Guide*.

*The download link is included in the confirmation email.
**Check your spam folder if you haven’t heard from us in the next minutes.

Monthly Survey

Every month another question
to help providing you with better content. 

Results are shared in the newsletter.
Not registered?

Thank You!